Nancy Wrote on Holgraphic Presentation Last night...
http://www.zetatalk.com/newsletr/issue169.htm
"Over to S America the Andes are shown doing mountain building, while some islands in the Caribbean are sinking, their plate
pushed under as S America rolls."
-Caribbean Subducting under Northern South America:
7 of 10 - Safe Locations
https://poleshift.ning.com/profiles/blogs/7-of-10-safe-locations
Tags:
Heavy rains cause landslides in Miranda
26-06 9:17 pm |
In Municipal Plaza and Zamora
Heavy rains cause landslides in Miranda
Caracas, (Special) .- According to AVN reported Sunday, municipalities and Zamora Plaza Miranda state were affected by floods and landslides that have damaged homes and roads.
This was announced by Victor Lira, director of Civil Protection and Disaster Management (PC) Miranda state, adding that machines remove the debris blocking roads.
Lira explained that 95 homes were flooded, and although 74 were at risk of sliding, have suffered no structural damage.
That is why specialists are conducting a study to determine which areas are prevention measures to be taken.
He did not rule that in case of continuing landslides, will proceed to the evacuation of homes.
He explained that there is still an earthwork in the road sector Cardonal Las Casitas, Zamora Municipality, where 70 homes are at high risk of continued rainfall.
On the National Highway, said that continuing landslides in the lower village Araira, Chuspita, Salmeron. This sector reported 5 homes flooded.
Noted that vehicular traffic is restricted to Araira by landslides that blocked the road.
In the case of Return of the Pot sector, municipality Plaza, 20 homes were flooded and are at risk.
On the state of the roads, said that a bridge scour Araguita, municipality Acevedo, interrupts the passage area Caucagua Guatopo to the National Park and all villages in the sector.
The bases of the bridge recently installed to communicate populations with Mamporal Tacarigua Brion, Brion municipality, was also affected by the rains.
In the Gran Mariscal Ayacucho highway, between the tunnel and the dealer's Kempi Quemaíto, several landslides that restrict vehicular traffic on this arterial road.
Civil Protection reported that Lira Municipality of Zamora continues the work of Nelly search Guilarte, 42 years old, missing since the early hours of Saturday after he was dragged by the rising of the creek The Guayas, sector leading the same name.
http://www.notitarde.com/notitarde/plantillas/nota.aspx?idart=13599...
Interesting Sismic Activity on Nicaragua:
Image from:
http://www.ineter.gob.ni/articulos/areas-tecnicas/geofisica/sismogr...
Compare with the ones on Liss:
From:
http://aslwww.cr.usgs.gov/Seismic_Data/heli2.shtml
Also USGS didn't show the other two Quakes in Nicaragua:
On Saturday 4.3 in front of Volcan Cosiguina and 3.3 ofshore Port Sandino
From:
July 7, 2011
"Megahole" collapses entrance to Caracas from the ARC
Marcos Castillo | mcastillo@el-carabobeno.com
A megahueco which opened in the Valley Freeway car-restricted for at least three days access for those seeking to reach Caracas from theARC. The heavy load must access the capital Hoyo de la Puerta.
Two to three days long the first part of the replacement of the metalculvert that collapsed Friday in the aforementioned point, and generated a huge crater eight meters long by three wide.
Minister of Transport and Communications, Francisco Garces, from thearterial road, said the first part of the work includes removing tubing,more than 40 years, and then shaping the way, later to perform the necessary analysis .
In a note of the AVN, Garces said clock MTC staff will work with ninemachines and several trucks. He explained further that will install aconcrete drainage system internally. At noon on Friday began to sink the pavement and caused the hole.
The space occupies two channels of the road, therefore, coupled withthe work, traffic will be interrupted in the sense artery Caracas.However, the minister said backflow remain open since January runs from Maya to allow the transfer to the capital.
He said that all the heavy lifting from the Central Regional Highway will be diverted by way of Hoyo de la Puerta, Universidad Simón Bolívar.
http://www.el-carabobeno.com/portada/articulo/16710/quotmegahuecoqu...
This free script provided by
JavaScript Kit
© 2025 Created by 0nin2migqvl32. Powered by