3/22/26 Air Canada plane collides with fire truck at LaGuardia AP in New York City, pilot and co-pilot killed, dozens injured
EMPs and EV Vehicles are an explosive combination
https://poleshift.ning.com/xn/detail/3863141:Comment:1170678
EMP Denial 02.19.26Passenger aircraft CRASH-LANDS on Mogadishu beach 02.10.26



EMP DENIAL: When major airlines started going down from EMP we pointed out the nexus – they were most often going over a fault line or plate border under duress and under water. This was true of AF447 which was on the Africa Plate border and MH370 likewise in Indonesia, but the airline industry, intent on continuing their profits, denies this. Note this Learjet in Philadelphia went down near a river and smack on the Ramapo Fault Line, and within the SE Portion which has been under an intense stretch as it is pulled SE toward Africa during the New Madrid Adjustment as the Methane Maps show.
Images taken of the plunging Learjet show the jets still in operation, full on throttle, but the jet steering controls are missing in action. This is symptomatic of an EMP, where some electronics are reacting to a pulse but others have suffered a burnout and are inoperable. To explain this accident the establishment would have to admit to the presence of Nibiru and the Plate Movements and charged tail wafting Earth that have resulted. Since the establishment is terrified of the panic that a Nibiru admission will cause, the truth once again will also be a victim.
https://www.zetatalk.com/ning/28fe2025.htm
Comment
https://dailyinterlake.com/news/2026/jan/09/whitefish-mountain-reso...
Skiers ride the Chair 1 Big Mountain Express lift at Whitefish Mountain Resort on Dec. 31, 2025. (Matt Baldwin/Daily Inter Lake FILE)
Skiers were evacuated from the Chair 1 Big Mountain Express lift at Whitefish Mountain Resort on Friday morning after a mechanical failure, according to resort officials.
The high-speed quad lift that accesses the summit of Big Mountain stopped at about 9:55 a.m. Lift mechanics were unable to fix the issue, and the backup system didn't function, prompting a full evacuation at about 11:30 a.m. All skiers were evacuated by 1:45 p.m.
Resort officials estimate about 150-200 people were on the lift when it stopped. The temperature at the summit was 15 degrees at noon, with a wind chill of 4 degrees.
Hellroaring Basin and Flower Point were closed during the evacuation so all ski patrollers could assist.
"More than 40 employees — including patrollers, mountain ambassadors, ski instructors and staff from the terrain parks and events department — were directly involved in the evacuation process," a message posted the resort's snow report stated. "Four patrollers came in on their day off to assist."
Officials expected the lift to be running again soon.
"Our lift maintenance team has identified the issue and believes it will be quickly resolved once the evacuation is complete," resort spokesperson Chad Sokol told the Inter Lake.
People who were evacuated will receive free lift tickets for future use, Sokol said. Passholders involved were given tickets that can be used by friends or family.
"If any guest involved did not make it to the Base Lodge today, they can still call or visit in the coming days," Sokol said.
Chair 1 is 2,084 feet long and takes skiers from the base area to the summit in about 8 minutes. The current lift was installed in 2007, replacing the former Glacier Chaser lift that is now Chair 2, according to resort information.
Sandton, South Africa
A fire at an electrical substation in the Marlboro/Eastgate area of Sandton on January 8, evening led to the temporary closure of Olympia Street. It prompted a swift emergency response from local authorities.
The incident occurred at approximately 19:15 and resulted in the closure of Olympia Street between Delphi Street and 15th Street while emergency services worked to secure the area.
The City of Johannesburg Fire Services, supported by FADT SecureFire services, responded promptly and successfully extinguished the fire.
“No injuries were reported as a result of the incident.”
MIDDLETON, Massachusetts
Hundreds of inmates at the Middleton House of Correction were evacuated to other buildings after a transformer exploded at the facility on Tuesday, officials said.
The transformer exploded outside an inmate housing unit at about 6:30 p.m. and “resulted in the evacuation of 407 inmates to other buildings within the secure perimeter,” the Essex County Sheriff’s Department said in a statement.
“The evacuation was orderly and secure, and there were no injuries,” officials said.
The explosion caused a fire that was extinguished. The housing unit “remains offline as firefighter crews and personnel from Middleton Electric assess the damage,” officials said.
The sheriff’s department brought in additional personnel to maintain security at the facility, and public visits were canceled for Wednesday, officials said.
Summerside, PE - Canada — Officials say a fire at an electric plant in western Prince Edward Island is now out, though the facility remains offline.
Crews responded to the scene at the Summerside Electric Power Plant around 5:50 p.m. Tuesday. The fire was contained by about 6:45 p.m. and officially declared over by 7:30 p.m.
“The plant’s exhaust system ignited as result of the Summerside Electric diesel generators operating at high capacity to meet peak energy loads over the last few days.”
The plant was immediately taken offline due to the fire. The city says there were no injuries, evacuations, or immediate risk to public safety.
A fire crew remained on site overnight as a precaution.
The plant remains offline, pending a full inspection and damage assessment, which is scheduled for Wednesday.
Havenside, South Africa, 18 hrs ago ~ Dear Residents of Umhlatuzana /Kharwastan/ Burlington Heights and Burlington Greenfields
Electricity Outage Update:
06/01/2025, 21:29
The outage is due to a fire at the Main Substation in Havenside. The Fire Department is attending to the situation, I am unable to provide a restoration timeline at this stage.
Kind regards
Cllr Samantha Windvogel
Ward 65
Chippenham, UK - Hundreds of Chippenham homes are without power after a substation explosion.
Firefighters were called to Gloucester Close, in the Queens Crescent area, shortly after 6pm this evening (Tuesday).
A substation burst into flames and at least one explosion was heard – as the incident knocked out the power in the vicinity.
Two crews – from Chippenham and Corsham – remained on scene at 8pm.
The power cut initially affected hundreds of homes across the town. The outage was resolved for most, but approximately 80 homes remain without electricity.
BUFFALO, New York
National Grid says about 3,400 customers are without power in the City of Buffalo. Much of the outage, according to the utility's mapping software, is just east of Main Street in downtown Buffalo.
A National Grid spokesperson tells 7 News, there was likely an underground fault that's causing issues in the city.
"The City of Buffalo has all underground service, so crews have to diagnose the issue, likely caused by fault in underground line," the spokesperson said.
It's unclear what exactly caused the fault.
Power outages stretch from East Utica Street, east of Main street, all the way south to Perry Street.
National Grid expected to have power restored by 10:30 a.m.
https://www.wkbw.com/news/local-news/buffalo/underground-fault-caus...
Eurostar suspends all Europe trains over power issue during holiday travel
Eurostar has suspended all services connecting the UK to Europe due to power issues in the Channel Tunnel, disrupting holiday travel. Passengers were left stranded as trains from London to Paris, Amsterdam, and Brussels were cancelled.
A Eurostar spokesperson stated, “There was a power supply problem in the Channel Tunnel followed by a shuttle train coming to a halt inside.”
Stranded travelers expressed frustration and disappointment as they sought alternative transport. Many faced challenges finding flights or buses due to high demand and fully booked options. The incident adds to recent criticisms of Eurostar's service quality and pricing.
BREAKING: Massive blackout hits Argentina capital Buenos Aires amid intense heat
Buenos Aires and its surrounding metro area were hit by a massive blackout during an extreme heat wave. At the peak, close to one million users lost power.
Argentina is ending the year under intense, record‑level heat, with an orange alert issued for the capital. Nighttime temperatures were still around 30°C, which pushed electricity demand to the limit.
Early reports point to:
A failure at an Edesur substation, which triggered the widespread outage.
High tension problems due to extreme demand during the heat wave.
The blackout began late Tuesday night and lasted several hours, with the worst point around 4 AM, when more than 920,000 users were without electricity.
Power was restored gradually, and by midday only a few thousand users were still without service.
EMP DENIAL
Six injured and more than 100 stranded as cable car 'slams into mou...
Six people, including a child, were left injured after a cable car slammed into a station barrier while approaching a mountain summit 'too quickly' in Italy.
Around one hundred people were also left stranded following the incident, which took place at the Macugnaga cable car, in the Verbano-Cusio-Ossola region of Piedmont.
The surrounding ski slopes were closed, and the ski lift was halted following the incident.
Firefighters are working on the scene to rescue those injured and stranded.
The six injured were immediately treated by on-site medics, but are set to be transported to a local hospital via air ambulance.
Filippo Besozzi, the director of Macugnaga Trasporti e Servizi, told Ansa: 'We had a technical problem.
'We're evaluating it; initial reports suggest the train didn't decelerate properly when entering the station and hit the station barrier'.
Besozzi reassured that none of the skiers were left with serious injuries, and that no one's life is in danger due to the incident.
'We had a few people in the cabin; I can't say exactly how many at this time, and the one with the most serious injuries is a 59-year-old man with a wound to his arm. Others suffered minor grazes,' he said.
The work cost €2million, of which €1.8million was funded by the Piedmont Region and €200,000 by the Municipality of Macugnaga.
This is a breaking news story. More to follow.
https://poleshift.ning.com/forum/topics/last-trimester-event-timeline
NEW POLE SHIFT UPDATE!
Nancy Lieder November 11, 2025 ZetaTalk Chat for November 30, 2025 - Earth Changes and the Pole Shift
Nancy Lieder, Emissary of the Zetas.
https://poleshift.ning.com/xn/detail/3863141:Comment:1168188
Awakening to the Alien Presence ZetaTalk
The truth will likely never to be known to the public but be washed away in the Nibiru panic soon to engulf the world.
The Worst of the Cover-Up
https://poleshift.ning.com/profiles/blogs/the-worst-of-the-cover-up
Main Establishment Lies
https://poleshift.ning.com/profiles/blogs/main-establishment-lies
© 2026 Created by Juan F Martinez.
Powered by
You need to be a member of Earth Changes and the Pole Shift to add comments!
Join Earth Changes and the Pole Shift