š„FORTRESS: The Pentagon is preparing every major U.S. military base to survive 90 days without outside support ā no civilian power grid, no global supply chains, no outside fuel or water.
Trump: Data Centers to produce electricity and pay a "dividend."
17-gigawatt Texas power project passes key hurdle for worldās largest private grid
US data centers are facing an unprecedented 64-month wait to connect to the grid, prompting developers to shift toward building their own power solutions.
There isn't a definitive government count. One reason is that there is no central regulatory requirement to register every data center. Data Center Map explicitly warns that databases therefore cannot be 100% complete. [datacentermap.com]
One current industry directory lists 4,767 U.S. data centers across all 50 states, operated by about 1,900 operators. These are not all AI centers. They include cloud, colocation, hyperscale and other facilities.
Thousands of data centers already operate in the United States, while a major new generation of very large, AI-oriented facilities is being built or proposed.
The scale is easier to establish through energy demand than building counts. The U.S. Department of Energy reported that data centers consumed about 4.4% of total U.S. electricity in 2023 and projected approximately 6.7% to 12% by 2028. [energy.gov]
Short takeaway: From a ZetaTalk perspective, distributing data centers across many locations can be interpreted as a quiet form of resilience-building ā something that could align with preparations for grid fragility, infrastructure decentralization, and postāShift survivability. This does not mean mainstream planners are consciously preparing for a Pole Shift, but the pattern matches ZetaTalkās longāstanding warnings about centralized systems failing.
ZetaTalk consistently emphasizes decentralization, local autonomy, and distributed infrastructure as critical for surviving both the Last Weeks and the Aftertime. When you apply that worldview to modern AI and cloud infrastructure, several parallels emerge.
ZetaTalk says the Pole Shift will:
fracture the grid
destroy long-distance transmission lines
isolate regions
break centralized control systems
A distributed dataācenter architecture mirrors the survival principle:
āSmall, local nodes survive better than one giant hub.ā
In ZetaTalk logic:
A single megaācenter = vulnerable
Many smaller centers = redundancy
This is exactly how hyperscale cloud providers now operate:
dozens of regional zones
edge compute nodes
microādata centers near population clusters
Itās a grid-fragmentation survival pattern.
Trumpās comment about data centers āproducing their own energyā aligns with:
solar microāgrids
hydrogen fuel cells
naturalāgas microāturbines
small modular reactor proposals
battery farms
ZetaTalk repeatedly says:
centralized grids will fail
local generation is the only stable model
communities must be energyāindependent
A data center with its own microāgrid is essentially a protoāAftertime energy node.
ZetaTalk predicts:
satellites failing
long-distance communication disrupted
fiber lines severed
EMP-like surges
Modern āedge computeā is designed to:
keep local services running even if the backbone fails
process data without relying on distant servers
maintain autonomy during outages
This mirrors ZetaTalkās survival doctrine:
āLocal processing, local decision-making, local autonomy.ā
Data centers are increasingly built with:
hardened shells
underground components
isolated cooling systems
redundant fiber paths
EMP-resistant designs (for military contracts)
ZetaTalk says:
underground = safer
hardened structures survive wind blasts
redundancy is essential
The industry trend unintentionally mirrors ZetaTalkās ātrench shelterā logic:
āProtect the core systems from debris, wind, and electrical surges.ā
ZetaTalk warns that:
coastlines will be devastated
fault zones will rupture
certain regions will be permanently flooded
others will become deserts
Cloud providers now place data centers:
inland
away from coasts
near stable geology
in cooler climates
This is not framed as Pole Shift preparation, but the pattern matches.
ZetaTalk emphasizes:
loss of libraries
loss of digital records
collapse of institutions
need for knowledge preservation
Distributed data centers:
store redundant copies of global knowledge
maintain multiple backups
replicate constantly across regions
This is essentially a global seed vault for information.
Yes ā the pattern of distributed, hardened, semiāautonomous data centers is exactly what ZetaTalk says would be needed to survive a catastrophic grid collapse.
No ā the industry is doing this for:
latency
reliability
cost
AI scaling
energy efficiency
But the effect is the same: A decentralized, resilient infrastructure that would survive more disruption than the old, centralized model.
What do you think?Ā
Comment
š„FORTRESS: The Pentagon is preparing every major U.S. military base to survive 90 days without outside support ā no civilian power grid, no global supply chains, no outside fuel or water.
The initiative, revealed in documents reviewed by Fox News Digital, envisions portable nuclear reactors, massive battery storage, and microgrids that can disconnect installations from civilian electricity entirely. Strategic reserves of munitions, fuel, critical minerals, and medical supplies would be stockpiled based on wartime consumption rates. Civilian factories are being pre-identified to shift to defense production during a crisis.
Pentagon chief spokesperson Sean Parnell put it bluntly: "Power is combat now. Without electricity, you lose communications, water, logistics, assembly lines and just basic military command structures."
š° Article Link:
https://www.foxnews.com/politics/inside-pentagons-doomsday-plan-kee...
From a ZetaTalk perspective, this Pentagon move would not be viewed as preparation for an ordinary war alone. ZetaTalk followers would likely interpret the FORTRESS program as indirect evidence that government planners expect a period when normal infrastructure cannot be relied upon.
Officially, the Pentagon says the program is intended to ensure military installations can continue operating if power grids, communications, fuel supplies, water systems, or global supply chains are disrupted during a major conflict. The initiative would require major bases to be able to function independently for at least 90 days. [ntd.com], [foxnews.com]
A ZetaTalk interpretation would typically be:
ZetaTalk has long claimed that governments know severe Earth changes are coming and are quietly preparing critical facilities. In that framework, "90 days of self-sufficiency" would be seen as preparation for:
ZetaTalk often states that governments' first priority is continuity of command. A self-sufficient military base with:
would fit the ZetaTalk concept of ensuring that military and government operations survive even if surrounding civilian systems fail.
The Pentagon's public statements say that assumptions that America's oceans provide sufficient protection are outdated and that bases should not rely on civilian infrastructure. [foxnews.com], [ntd.com]
A ZetaTalk believer might interpret this as an admission that authorities expect disruptions to occur inside the United States, not just overseas.
ZetaTalk frequently discusses elite preparations occurring before public acknowledgment of a coming crisis. In that narrative, strategic stockpiles, microgrids, nuclear reactors, fuel reserves, and hardened military facilities would be viewed as signs of preparation occurring ahead of eventual disclosure.
Combining this with the FEMA/FCC nationwide alert test we mentioned earlier, some ZetaTalk followers might conclude:
"The communications systems are being tested while military installations are being hardened and made self-sufficient. Both actions point toward preparation for a future nationwide emergency."
A typical ZetaTalk-oriented interpretation might be:
"The 90-day requirement is not primarily about foreign war. It is about making sure military command and government functions survive the infrastructure disruptions expected during the Earth Changes, when the civilian grid, transportation network, and supply chains become unreliable."
That is the ZetaTalk interpretation. The official Pentagon explanation is that FORTRESS is a resilience and homeland-defense initiative designed to keep military operations functioning during major disruptions, including war-related disruptions to power grids and supply chains. [ntd.com], [foxnews.com]
What do you believe is the real reason?
Trump: AI/SI Data Centers to produce electricity and pay a "dividend."
Everything will make more sense to the average person once the presence of Nibiru in our solar system is acknowledged and the impending Pole Shift is understood.
AfterTime Power, Super Intelligence and AI Data Centers - Earth Cha...
17-gigawatt Texas power project passes key hurdle for worldās largest private grid
A massive new energy project in the Texas Panhandle has moved one step closer to reality. Developer Fermi America received a favorable draft environmental review from the U.S. Nuclear Regulatory Commission (NRC) for Project Matador, a proposed AI and supercomputing campus powered by four Westinghouse AP1000 nuclear reactors. NRC staff issued a preliminary recommendation to approve the reactor licenses, pending completion of safety evaluations.Ā
The project is notable because it aims to create a 17-gigawatt private power grid, potentially becoming the largest privately operated power system in the world. Rather than depending entirely on the public electrical grid, Project Matador would combine nuclear power, natural gas generation, solar facilities, and large-scale battery storage to provide dedicated energy for AI data centers and advanced computing operations.Ā
The speed of the federal review is also drawing attention. The favorable environmental assessment was issued only about 15 months after the application was filed, a much shorter timeframe than is typical for major nuclear projects.Ā
Project Matador illustrates the growing race to secure enormous amounts of reliable electricity for artificial intelligence. As AI computing expands, governments and corporations are increasingly turning toward nuclear power and independent energy infrastructure to ensure uninterrupted operations. From a ZetaTalk Pole Shift perspective, this trend reflects an elite push to maintain technological capability and centralized control despite mounting concerns over grid instability, infrastructure stress, and future Earth changes. The development of self-contained power systems suggests recognition that dependence on traditional public grids may become increasingly risky in uncertain times.
Bottom Line: The Texas project is more than a nuclear plant. It represents a new model where AI, supercomputing, and dedicated power generation are merged into self-sustaining technology hubs, potentially foreshadowing how critical infrastructure may be organized in the years ahead.
AfterTime Power, Super Intelligence and AI Data Centers - Earth Cha...
New Aftertime Power Solutions:Ā Why NuScaleās Nuclear Breakthrough Could Change the AI Energy Race
A recent video examines NuScale Power's role in the growing push to provide energy for artificial intelligence infrastructure. The presentation highlights NuScale's regulatory progress and its position within the emerging small modular reactor (SMR) industry. According to the video, NuScale has developed a significant lead through regulatory approvals and ongoing project development, placing it among the better-known companies seeking to deploy next-generation nuclear power systems.
The central theme is the rapidly growing electricity demand created by AI data centers. As artificial intelligence expands, technology companies are searching for reliable, large-scale energy sources capable of operating around the clock. Nuclear power is presented as a potential solution because it can provide continuous baseload power without dependence on weather conditions.Ā
The video also stresses that obtaining regulatory approvals is only one step. The larger challenge is transforming early technological and regulatory success into actual commercial reactor deployments. Financing, construction, project execution, and customer adoption remain significant hurdles. Investors are encouraged to watch whether NuScale can successfully move from planning and approvals to functioning energy projects.
For Pole Shift Ning members, this development is noteworthy because it reflects growing concern over future energy availability. The push toward SMR nuclear technology suggests governments and corporations anticipate substantial increases in power demand, particularly from AI systems. Whether viewed as a technological advancement or as part of broader societal shifts, the renewed interest in nuclear energy indicates that energy security is becoming a strategic priority. This observation is an interpretation and not stated in the video itself.
Video: Why NuScaleās nuclear breakthrough could change the AI energy race
AfterTime Power, Super Intelligence and AI Data Centers - Earth Cha...
AI data centers use dramatically more electricity than older data centers because of the rise of GPU-based computing and the enormous computational demands of training and running AI models.
Traditional data centers mainly handled:
These workloads often ran on CPUs that spent much of their time waiting for requests.
AI data centers use thousands of GPUs working simultaneously. A single modern AI GPU can consume several hundred watts, and entire GPU clusters can draw megawatts of power continuously. Unlike many traditional servers, AI hardware often runs at very high utilization for extended periods.
Computers are essentially electric heaters that happen to perform calculations.
For example:
100 MW of electricity in ā ~100 MW of heat out
Every watt consumed by processors, memory, networking gear, and power supplies eventually becomes heat that must be removed.
An older data center rack might have used:
An AI rack may require:
Packing that much power into a small space creates intense heat concentrations.
Cooling isn't free.
Additional power is consumed by:
So if servers consume 100 MW, the facility may need substantially more power to support cooling and infrastructure.
Many traditional data-center workloads fluctuate during the day.
AI training jobs often run:
This creates a steady, massive demand for both electricity and cooling.
Residents near new AI campuses often notice:
ā Large electrical substations
ā Constant fan noise and cooling tower hum
ā Heavy water use in some cooling systems
ā Backup generator installations
ā Large land requirements
The visible building may look like an ordinary warehouse, but inside it may contain tens of thousands of high-performance processors generating immense heat.
Think of:
Both occupy buildings, but the AI facility uses much more energy and produces far more heat, which is why power consumption and cooling have become major challenges in the AI era.
AfterTime Power, Super Intelligence and AI Data Centers - Earth Cha...
Many AI data centers can be quite loud.
The main sources of noise are:
Typical sound levels vary:
Because modern AI workloads use dense GPU clusters that consume huge amounts of power, AI-focused data centers often require even more cooling than traditional data centers, making noise a growing concern for nearby communities.
AfterTime Power, Super Intelligence and AI Data Centers - Earth Cha...
US data centers are facing an unprecedented 64-month wait to connect to the grid, prompting developers to shift toward building their own power solutions.
The average wait for grid connection in U.S. data center projects has reached 64 months, reflecting a median timeline of nearly five years from application to operation. In many markets, queues now extend three to seven years, with Northern Virginia, Texas, Ohio, Illinois, Oregon, and Georgia among the most affected regions. Limited transmission and distribution capacity, declining construction of high-voltage lines, and planning processes unable to match surging demand are key drivers of these delays. Demand growth from AI and cloud workloads has outstripped both the administrative and physical capacity of the interconnection process, leaving most queued projects unbuilt.
Region
|
Typical wait time
|
Notable contributing factor
|
|---|---|---|
Northern Virginia
|
5ā7 years
|
Grid connection pause in Loudoun County
|
Texas
|
3ā7 years
|
Projected tripling of data center load by 2030
|
Ohio
|
3ā7 years
|
High concentration of data center projects
|
Illinois
|
3ā7 years
|
Water scarcity and utility strain
|
Oregon
|
3ā7 years
|
Water scarcity and river low-flow conditions
|
Georgia
|
3ā7 years
|
Combined zoning and resource constraints
|
Developers pivot to self-built power strategies
These prolonged waits are driving a fundamental change in how developers approach power planning. Average grid waits of up to 64 months are pushing US data center developers to pursue power they can build and control themselves. This shift moves critical reliability functions onto the facilities, requiring expertise in fuel security, reserves, and grid-independent operation. Microgrids are being deployed to connect diverse generation sources and storage under unified control, enabling islanding or parallel grid operation.
Data Center Frontier +2Elon Musk: SpaceX is a super intelligence company
AfterTime Power and AI Data Centers ā ZetaTalk Perspective - Earth ...
President Donald Trump's recent move on "Super Intelligence," he has both renamed federal references to AI as "Super Intelligence (SI)" and announced the creation of a Super Intelligence Force (SIF) to coordinate U.S. policy and leadership in the field. [whitehouse.gov]
Key points:
AfterTime Power and AI Data Centers ā ZetaTalk Perspective - Earth ...
Ā© 2026 Created by Juan F Martinez.
Powered by
You need to be a member of Earth Changes and the Pole Shift to add comments!
Join Earth Changes and the Pole Shift