BREAKING: 911 call centers across the country are experiencing
outages, making it harder for people to reach emergency services. 6/26/26

EMP DENIAL: When major airlines started going down from EMP we pointed out the nexus – they were most often going over a fault line or plate border under duress and under water. This was true of AF447 which was on the Africa Plate border and MH370 likewise in Indonesia, but the airline industry, intent on continuing their profits, denies this. Note this Learjet in Philadelphia went down near a river and smack on the Ramapo Fault Line, and within the SE Portion which has been under an intense stretch as it is pulled SE toward Africa during the New Madrid Adjustment as the Methane Maps show.

Images taken of the plunging Learjet show the jets still in operation, full on throttle, but the jet steering controls are missing in action. This is symptomatic of an EMP, where some electronics are reacting to a pulse but others have suffered a burnout and are inoperable. To explain this accident the establishment would have to admit to the presence of Nibiru and the Plate Movements and charged tail wafting Earth that have resulted. Since the establishment is terrified of the panic that a Nibiru admission will cause, the truth once again will also be a victim.
https://www.zetatalk.com/ning/28fe2025.htm

Views: 71328

Comment

You need to be a member of Earth Changes and the Pole Shift to add comments!

Join Earth Changes and the Pole Shift

Comment by M. Difato on May 23, 2017 at 8:32am

Window washers trapped high up AXA Tower in Syracuse when fire knocks out power (video)

http://www.syracuse.com/news/index.ssf/2017/05/window_washers_trapp...

 SYRACUSE, N.Y. -- Two window washers Monday (May 22) morning suddenly found themselves stuck on a  scaffold, hanging against a building whose basement was on fire in downtown Syracuse.

Reynaldo Ramos, 38, said through a translator that he and his partner were washing the windows -- something that gets done a couple times per season -- on the AXA Tower I building when they smelt something burning.

Not long after they heard a large explosion below, and suddenly the lights inside the tower building went out.

Their scaffold equipment, hovering near the sixth floor, wouldn't move. It runs on electricity, so they were stuck when the power went out.

While employees inside Tower I and along a wing of the complex were evacuated, Ramos and his partner had to sit tight up against the 19-story building and wait to be rescued.

A transformer in an underground electrical vault had caught fire, said Glen Chandler, a district chief of the Syracuse Fire Department. What sparked the electrical fire is still unknown.

Firefighters responded to South Warren Street between East Onondaga / Madison Street and Harrison Street, roping off the block with yellow tape and emergency vehicles.

After the explosion, large clouds of black smoke began pouring up from the ground-level grates along the street, witnesses said. The black smoke eventually lessened to white plumes and eventually stopped.

Firefighters used a ladder to reach the two window washers to make sure they were OK.

The question was how to get the two men down.

Firefighters brought a portable generator up to the window washers to power the scaffolding, Chandler said. The two were stuck for no more than an hour, he said.

The fire below the building eventually burned itself out.

No one was seriously injured during the incident, Chandler said. National Grid is still surveying the transformer and the other electrical mechanisms inside the underground vault..."

https://www.youtube.com/watch?v=BGPGG5Ra_4g 


~

 Oregon,

Live or work in downtown Portland? Expect to  remain without power Tuesday

   http://www.oregonlive.com/portland/index.ssf/2017/05/power_outage_a...

  "..A fire in an underground vault that houses electrical equipment prompted officials to shut down power for

  about 2,200 customers Monday evening, said Pacific Power spokesman Tom Gauntt..."

~

 Nevada, 

 More Than 4,000 Without Power Near Reno-Stead Airport

 http://www.ktvn.com/story/35492408/more-than-4000-without-power-nea...

 More then 4,100 NV Energy customers are without power just south of the Reno-Stead Airport.

 The outage was first reported around 9:30 p.m.

 According the NV Energy's Outage Center, the outage is being caused by an issue with equipment.

Power should be restored by 12:30 a.m.

Comment by M. Difato on May 18, 2017 at 10:47pm

Desert Regional power issues last 32 hours, elective surgeries delayed

 http://www.desertsun.com/story/news/health/2017/05/18/desert-region...
 Elective surgeries in Palm Springs were delayed for a second-consecutive day due to a power outage at Desert Regional Medical Center.

The power outage occurred early Wednesday, hospital spokesman Rich Ramhoff announced Thursday morning. Electricity was restored noon Thursday, a Southern California Edison spokeswoman said.

The hospital had been operating on backup generators. Other hospital services, including its emergency department and trauma center, continued as normal, Ramhoff said.

An unknown number of non-emergency elective surgeries set for Wednesday and Thursday were rescheduled as a precaution, Ramhoff said.

"Certainly rescheduling elective surgeries is an inconvenience for our doctors and our patients," Ramhoff said, "We don't like to see that, but as far as provisions to the community, our generators are prepared for that."

The outage was caused by a transformer problem that only affected the hospital, Ramhoff said.

Desert Regional can run on backup power from its generators for several days, he said.

Southern California Edison crews worked on the outage. The company spokeswoman said the outage occurred around 4 a.m. Wednesday.

~

Comment by M. Difato on May 18, 2017 at 4:18am

4 trapped in elevators after fire causes power outage in Prescott Valley

https://www.dcourier.com/news/2017/may/17/transformer-fire-causes-p...


 A fire in a transformer at the M&I Windows and Doors facility in the 7500 block of East Highway 69 Wednesday morning caused a widespread power outage in Prescott Valley — which trapped four people in elevators.

Over 1,300 customers were initially affected as power went out around 10:30 a.m., APS spokesman Alan Bunnell said.

Traffic lights were out at intersections around town for a brief time.

Elevators at Yavapai Regional Medical Center’s Del E. Webb Outpatient Center and the Yavapai Community Clinic were stuck between floors and Central Arizona Fire crews had to rescue two people from each of them, Division Chief Rick Chase said.

“They were able to use their key to open the outside doors (at the center) — there’s a special device we have — and, luckily, that elevator was only about a foot off the floor, so they just helped the people out.”

The other elevator was “several feet” from the floor, Davis said, and, the two people in it were a little more difficult to extricate, but they got out safely.

In all, the people were trapped in the elevators for about 30 minutes.

Firefighters didn’t put any water on the transformer fire, but waited for an APS crew to arrive, Davis said, and when a small transformer on a nearby pole ignited and caused a small grass fire, they were able to put it out quickly.

The fire was caught on video by Kathy Fitz; see  dCourier.com to view the video.

Within an hour, APS had all but 42 customers back online as a result of re-routing power, Bunnell said, and, by 2:30 p.m., only one customer remained without electricity.

The area affected was from Lake Shore Drive to Fourth Street and Kings Highway to Bravo Lane.

~

Comment by M. Difato on May 16, 2017 at 5:20am

Another Emergency sirens malfunction

 http://fox6now.com/2017/05/15/lomira-officials-emergency-sirens-are...

 Lomira, Wisconsin - Officials in Lomira said the emergency sirens are going off on this Monday, May 15th — and this is a malfunction of the sirens.

The telephone company is trying to fix the issue, officials said.

Officials said this malfunction is not the result of faulty equipment, but a glitch in the telephone communication system.

This is happening at an unfortunate time — with storms moving through Monday evening..."

~

Comment by Yvonne Lawson on May 15, 2017 at 3:35pm

The whole of Greater Manchester's tram network was shut down on Sunday because of a technical fault.

People in Exchange square

The whole of Greater Manchester's tram network was shut down on Sunday because of a technical fault.

Control room staff lost visible sight of trams, Transport for Greater Manchester (TfGM) said.

A spokeswoman said the failure, which is not being linked to a cyber-attack, was discovered at about 15:50 BST.

The service remained out of action until the end of the day, but transport chiefs said it would be running normally on Monday.

Earlier Metrolink had said it had not yet been able to locate the fault and technicians would be working through the night to resolve the problem.

But shortly after midnight, the firm said: "All tram services are set to operate as normal on Monday morning following a major technical issue on Sunday which affected the network."

'Stranded with children'

On Sunday afternoon, all services stopped with Metrolink saying: "Due to a communication fault, all lines are suspended."

At about 22:00 Metrolink had added: "Technicians will work through the night, but until the fault is identified there is no timescale for recovery of the systems."

Frustrated travellers contacted the BBC to share their stories.

One, who bought tickets just before the service stopped, said: "I was stranded with three small children.

"I ended up having to pay for a taxi which cost me a further £7 on top of my tram ticket."

Another simply described it as "a shambles".

Metrolink apologised for the inconvenience and later said: "Apologies again and thank you for all your patience today."

Source: http://www.bbc.co.uk/news/uk-england-39916615

Comment by M. Difato on May 14, 2017 at 5:45pm

Power outage plunges parts of Mindanao into darkness (May 13)
 http://newsinfo.inquirer.net/896673/power-outage-plunges-parts-of-m...

 ZAMBOANGA CITY – A power outage has plunged parts of Mindanao into darkness on Sunday night.
Beth Ladaga of the National Grid Corporation (NGCP), in advisory, said they were still trying to determine the cause of the blackout.
The power interruption has affected the entire Zamboanga Peninsula, entire Misamis Occidental and parts of Lanao del Norte.
Davao City is also experiencing a blackout.

Comment by M. Difato on May 12, 2017 at 11:52pm

Residents in Southeastern Massachusetts are dealing with a power outage that is impacting more than 20,000 people. (May 12)

 According to National Grid, a total of 31 incidents in the area have caused thousands of people to lose power.

 Seekonk Police said in a tweet that the cause for the outage isn’t known at this time.

 The National Grid website says one of the outages has an estimated restoration of 5:30 p.m., though it’s not clear if that’s a time frame for all affected areas.

This is a developing story; stay with 7News for the latest details as they become available.

http://whdh.com/news/power-outage-in-southeastern-mass-affecting-mo...

~

Comment by M. Difato on May 9, 2017 at 4:15pm

NYC Subway Delays: Power Outage Causes 'Extensive' Delays, Changes On Tuesday (May 9)

 https://patch.com/new-york/new-york-city/nyc-subway-delays-power-ou...
 NEW YORK, NY — A power outage at DeKalb Avenue left several major subway lines with "extensive" delays and service changes during the Tuesday morning commute.

Passengers were reporting very crowded and "dangerous" subway platforms shortly before 9 a.m.:

Here's what was going on just after 9 a.m., via the MTA:

There is no B train service between Brighton Beach and Bedford Park Blvd in both directions.

Southbound D trains are running on the C line from 59th Street-Columbus Circle to West Fourth Street-Washington

Square, then via the F line to Coney Island-Stillwell Avenue.

Northbound D trains are terminating at 36th Street (Brooklyn).

Expect extensive delays in C, F, N, Q, R and W train service..."

Comment by M. Difato on May 8, 2017 at 8:41pm

DOWNTOWN ST. LOUIS, Mo. (KMOV.com) – Nearly 1,000 people are without power in downtown St. Louis due to an underground explosion. (May 8)

Ameren officials said they are working diligently to restore power to more than 900 people in downtown buildings, including the Magnolia hotel and the Mansion House.

The area affected is from 4th St. in the eastern part of downtown, 9th street, and from Locust to Washington Ave.

Officials said about 12 traffic lights are out, but they brought out a generator to help fix the problem. Ameren hopes to have the lights back up by rush hour on Monday.

There are no injuries are reported at this time.

http://www.kmov.com/story/35371962/nearly-1000-affected-by-downtown...

Comment by M. Difato on May 8, 2017 at 4:44pm

Substation fire causes power outage in south Las Vegas May 08, 2017  http://www.fox5vegas.com/story/35368400/substation-fire-causes-powe...


 More than 4,200 NV Energy customers were without power Monday after a fire at a substation.

The outage was reported at about 5:40 a.m. in the area of Cactus Avenue and Las Vegas Boulevard. By about 7:30 a.m. a

little more than 900 customers were without power.

NV Energy confirmed the cause of the outage was due to a fire at a substation in the area.

South Point Hotel, Casino and Spa was also impacted by the outage.

According to NV Energy's website, power is expected to be restored by 8:30 a.m.

Further details on the fire were not immediately released. -  (LAS VEGAS ,FOX5) 

SEARCH PS Ning or Zetatalk

 
Search:

JUST NOW: Nancy Lieder says, "Morning guys. Feel we may get very busy so caught up on admin stuff. Clean deck urge."

People are paying attention, are you?

Trump admin to begin releasing UFO Files

 ZetaTalk: Most Terrible Day

https://poleshift.ning.com/forum/topics/last-trimester-event-timeline

NEW POLE SHIFT UPDATE!

Awakening to the Alien Presence ZetaTalk

The truth will likely never to be known to the public but be washed away in the Nibiru panic soon to engulf the world.

The Worst of the Cover-Up
https://poleshift.ning.com/profiles/blogs/the-worst-of-the-cover-up

Main Establishment Lies

https://poleshift.ning.com/profiles/blogs/main-establishment-lies

Donate

Donate to support Pole Shift ning costs. Thank you!

© 2026   Created by Juan F Martinez.   Powered by

Badges  |  Report an Issue  |  Terms of Service